Paver reinstating a trench on a Ceduna street

Trench Reinstatement Ceduna

West Coast Bitumen completed extensive service trench reinstatements following pipeline works across multiple sites in Ceduna, including the Eyre Highway. The works involved profiling, asphalt paving, and final linemarking to restore pavement integrity.

Across Schwarz St, Goode St, and Kalambi Rd, we performed 2,304m² of profiling and 60mm deep AC10M C320 asphalt reinstatement. High-impact works on the Eyre Highway required deep profiling (150-180mm) followed by a 225mm deep AC14M C320 asphalt patch.

A total of 340 tonnes of asphalt was delivered and installed across the four designated project sites.

Client

McConnell Dowell

Sector

Commercial