Our Projects
Aerial view of paving on a Port Lincoln intersection upgrade

Intersection Upgrade Port Lincoln

As part of the Eyre Peninsula Desalination Plant Project, West Coast Bitumen performed critical intersection works at Port Lincoln. The project required the profiling of 2,050m² of existing pavement followed by 2,822m² of eco-prime sealing and asphalt paving.

The surfacing scope included the installation of 28 tonnes of levelling course (55mm) and 258 tonnes of AC10M C320 wearing course (40mm). To minimise disruption for local residents and desalination construction traffic, the project was carefully staged to keep one lane operational throughout the works.

Operating as a subcontractor to a Tier 1 provider, West Coast Bitumen successfully adhered to the most stringent safety and quality management protocols required for major infrastructure delivery.

Client

Downer Group

Sector

Commercial